Marketplace
Shop Costway

Costway In-Pool HDPE Lounge Chair w/Wheels S-Curve Chaise Anti-Floating Weighted Chair - Brown

$168.95

(0)

SKU : P_110225290

Online only
Marketplace
Shop Costway

Costway In-Pool HDPE Lounge Chair w/Wheels S-Curve Chaise Anti-Floating Weighted Chair - Brown

$168.95

(0)

SKU : P_110225290

Online only
Sold and shipped by Costway

Description

Description:
Relax in unmatched style and comfort with this premium pool lounge chair tailored for shallow water lounging.
The built-in rear wheels make repositioning this patio lounge chair incredibly simple around your garden or pool, and the waterproof surface ensures low maintenance daily care. You can lie comfortably for hours since the ergonomic S-curve design beautifully mimics the natural human spine shape for full-body support. Crafted from weather-resistant HDPE, the poolside lounger endures harsh elements without fading or cracking under intense daily sunlight. Moreover, this firm 21 kg self-weighted sun shelf chair securely sits in waters between 14.5 cm and 22 cm deep, confidently supporting a weight capacity of up to a full 205 kg

Features:
Perfectly contour to your natural spine shape with ergonomic S-curve design
Keep low-maintenance routines with waterproof all-weather HDPE construction
Outstanding sun-proof material for long-lasting, fade-resistant vibrant colors
Achieve reliable anti-float security with heavy 21 kg weighted design
14.5-22 cm recommended water depth creates areas perfect for baja shelves
Lowered seating helps you stay cool while tanning in shallow waters
Ensure chlorine and saltwater-friendly usage with 304 stainless steel
Smooth, built-in wheels directly make repositioning simple and convenient
Widened structural beams for holding massive 205 kg weight capacity
Suitable for pool, deck, patio, garden and backyard
Assembly needed

Specifications:
Color: Brown
Material: HDPE
Overall Dimensions: 163 x 55 x 64 cm (L x W x H)
Recommended Water Depth: 14.5-22 cm
Net Weight: 21 kg
Weight Capacity: 205 kg

Package Includes:
1 x In-Pool Lounge Chair
1 x User Manual
DeliveryDelivery

For products purchased from Kmart and Target on kmart.com.au:

Free delivery for orders over $65 (excluding big and bulky products, online exclusive products and products purchased from Marketplace sellers). OnePass members also enjoy free delivery on eligible products (excluding clearance products, big and bulky products and selected products purchased from Marketplace sellers). Note: from 21 September 2026, as per notice from OnePass, free delivery is not available to OnePass members for clearance items, unless the order value is over $65. See FAQs for further detail.

  • Standard delivery: Metro $10: 3–5 business days, Regional $14: 7–10 business days, Remote $16: 14–20 business days.

  • Fastest delivery $12 (for eligible Kmart products only): Fastest delivery powered by Uber arrives within 3 hours on eligible orders. Timing and eligibility are confirmed at checkout. Orders placed outside the eligible same-day delivery time will arrive by midday the next trading day. Order and item eligibility outlined here.

  • Delivery fees vary by location and order type and will be calculated at checkout.

For products purchased from Marketplace sellers:

Marketplace sellers have varying delivery timeframes. Some eligible Marketplace seller products may offer Fastest delivery, with the available delivery date shown on the product listing page and at checkout. Delivery fees and timeframes vary by location and order type, you’ll find all this information earlier on each product’s listing page. Please note that the seller may not ship on weekends or observing public holidays.

Still have questions?

For information on returns and exchanges, please see our Returns policy. For details on how refunds are processed and timing, please see our Refunds policy. Still have questions? Please refer to Kmart FAQs or ask our chatterbot.